Question: 1
When
will Butterfly produce an Analysis Engine Report?
A.
When all collections are present as listed in the Pre-requisite Questionnaire
(PRQ).
B.When
some collections from the PRQ are listed, and there is a Target Design Guidance
(TDG).
C.When
all collections are present as listed in the PRQ. and there is any TDG.
D.When
all collections are present as listed in the PRQ. and there is one finalized
TDG.
Answer: B
Question: 2
Which
action should be taken if the Target Design Guidance (TDG) cannot capture
customer requirements successfully?
A.
upload other documents that capture the architecture
B.add
a free text note into the TDG explaining the situation
C.upload
it and check Bespoke TDG Requ before signing off
D.alter/add
products into the TDG to match the customer's needs
Answer: A
Question: 3
How
can a user get access to customer folders?
A.
use a special code
B.users
can access all customer folders
C.e-mail
the customer to request access
D.through
Butterfly authorized permissions
Answer: D
Question: 4
What
step should be taken if a collection is taking too long or hangs?
A.
request support from Butterfly
B.c
B. abort the collection and upload the output
C.
remove operations from the collector by editing it
D.
try a different collector than the one provided for this customer
Answer: A
Question: 5
Capacity
is related to occupancy how?
A.
Occupancy is not related to capacity
B.Capacity
is the amount of occupancy that is actively in use by clients
C.Capacity
is the amount of physical storage required to store occupancy
D.Capacity
and occupancy are interchangeable terms for the amount of client data being
protected
Answer: B
Question: 6
What
is the next step once a collection completes?
A.
add the output to a single archive containing all collections for that customer
B.add
the output to a single archive containing all collections for that data center
C.upload
the collection output manually and remove the collector and output file from
the system
D.the
collector will upload the collection automatically and request confirmation to
remove itself from the system
Answer: A
Question: 7
What
does the Pre-requisite Questionnaire represent?
A. The intended solution design.
B.
A list of clients eligible for migration.
C.
The assets in scope for analysis and business case.
D.
All the servers and hardware the customer has within their infrastructure.
Answer: D
Question: 8
How
are data centers listed in the Pre-requisite Questionnaire {PRQ) used?
A.
to make it easier to fill out the PRQ
B.to
determine the location of the assets for cost calculation
C.to
help an engineer find the assets when starting a collection
D.to
group assets exactly and display them on the Analysis Engine Report
Answer: D
Test Information:
Total Questions: 28
Test Number: M9060-616
Vendor Name: IBM
Cert Name: IBM Mastery
Test Name: TSM Butterfly Analysis Engine Report Sales Mastery V1
Official Site: http://www.certsgrade.com
For
More Details: http://www.certsgrade.com/pdf/M9060-616/
Get20%
Immediate Discount on Full Training Mater
Discount Coupon Code: 20off2016


No comments:
Post a Comment